Production Scheduler Print E-mail

Scheduling production is convenient to: 

  • Know the work load of each process.
  • Optimize delivery times and production.
  • Detect bottlenecks and be able to anticipate, reduce or eliminate these bottlenecks. 
  • Know the required resources beforehand.

The edinn® M2 system incorporates a scheduling display screen. Employees can choose the next task from the schedule and will be able to see their progress compared to production targets.  Edinn® M2 is integrated with world leading schedulers like Taylor® Decision One or Microsoft® Project, for less demanding environments.

Scheduling functions of edinn® M2 integrated with a scheduler:

  • Display of capacity organization
  • Resource control
  • Time optimizing
  • Automatic process assignment 
  • Work shift simulation
  • Optimization of individual capacities 
  • Monitoring stock and material levels. 
  • Connection to ERP
edinn scheduler  edinn scheduler
 
Follow us at | Recommend us | Contact | Registered trademarks | Privacy | © 2010 edinn