INDEX OF THE USER'S GUIDE
- Introduction
- Benefits: Identification of the losses
- Benefits: Production and maintenance control
- Benefits: Optimization of the processes
- Benefits: Visual, simple and easy to use
- Benefits: Obtain the main production indicators
- Benefits: Low costs and quick installation
- Its main functions:
ratios like OEE, SPC and Autocontrol
- What is OEE?
- What are SPC and CPK?
- What is Autocontrol?
- What are MTBF and MTTR?
- Interfaces with other systems
- Support and maintenance
- Project profitability
- Subsystems
- Functionalities
- Characteristics
- Basic Guide
- Start edinn® M2
- End edinn® M2
- Start window
- edinn® M2´s main window
- Products window
- Procedure: Product change
- Schedule
- In/Out
- Time usages window
- Procedure: justification of the states FAI – PENDING
- Autocontrol window
- SPC window
- Registry window
- Advanced guide
- On-line and off-line mode
- Maximum speed
- How to establish the maximum
speed?
- Maximum times and automatic changes
- Particularize through relations
- Launching autocontrol tasks
- Envision: failure forecast
- How to configure URLs
- Particularization Data field
- Reports
- Introduction
- Common aspects
- Predefined
- Efficiency
- Analysis of losses
- Products
- Products
- Production follow up
- Production
- Production evolution
- Evolution productions
- Times
- Times
- Estados
- Evolución de estados
- Losses
- Losses
- Detail of losses
- Ratios
- Ratios evolution
- Autocontrol
- Autocontrol
- Schedule Autocontrol
- Autocontrol Follow up
- Autocontrol Efficiency
- Autocontrol Configuration
- SPC
- SPC Capacity
- SPC Data
- Control
- Events
- Activity
- Not recorded
- Configuration
- Company configuration
- Devices configuration
- Personnel configuration
- Shifts configuration
- Team configuration
- Measurement Units configuration
- Calculation Types configuration
-
Processes configuration
- Lines configuration
- Steps necessary to show graphics for the production lines.
- Products configuration
- Time
usages configuration
- PP (process - product) relations configuration
- PTP (process -time
usage - product) relations configuration
- Periods configuration
- Autocontrol configuration
- Events configuration
- Measurement Devices configuration
- PPM relations configuration
- SPC Issues configuration
-
Scheduling
- Revision Notes
Copyright © 2004-2009 edinn. All rights reserved.